Skip to main content
-
Home
-
Documents + Reports
Summit Station Long Range Planning
Summit Station Site Plans, Policies, and Year-Round Measurements
Guides for Researchers
Summit Station CRREL Reports
- Snow Drift Management: Summit Station Greenland, ERDC/CRREL TR-16-16, Haehnel, R.B. and M.F. Bigl (2016)
- Summit Station Skiway Cost Analysis, ERDC/CRREL TR-16-9, Melendy, T.D. (2016)
- Site Assessment and Feasibility of a New Operations Base on the Greenland Ice Sheet: Addendum to Preliminary Report, ERDC/CRREL TN-15-2, Bigl, M. and E. Deeb (2015)
- Elevated Building Lift Systems on Permanent Snowfields: A Report on the Elevated Building Lift Systems in Polar Environments Workshop, ERDC/CRREL SR-14-2, Weale, J., L. Barna , W. Tobiasson , and J. Mercer (2014)
- Site Assessment and Feasibility of a New Operations Base on the Greenland Ice Sheet, ERDC/CRREL TR-13-11, Burzynski, A.M., S. Wong, J.L. Mercer, E.J. Deeb, and S.D. Newman (2013)
- Summit Station Skiway Review, ERDC/CRREL TR-13-6, Knuth, M.A., T.D. Melendy, and A.M. Burzynski (2013)
- Engineering Assessment of Big House at Summit Station, Greenland, ERDC/CRREL TR-11-10, Barna, L.A., K.J. Claffey, J.S. Buska, and J.L. Mercer (2011)
- Potable Water Supply Feasibility Study for Summit Station, Greenland, ERDC/CRREL TR-11-4, Haehnel, R.B. and M.A. Knuth (2011)
Greenland Inland Traverse (GrIT)
- Robotic Ground-Penetrating-Radar (GPR) Surveys to Support the 2014 Greenland Inland Traverse, ERDC/CRREL TR-16-8, J.H. Lever, Z.R. Courville, and D.A. Punt (2016)
- Advances in Antarctic Sled Technology, ERDC/CRREL TR-16-4, Lever, J.H., J.C. Weale, T.U. Kaempfer, and M.J. Preston (2016)
- Economic Analysis of the Greenland Inland Traverse (GrIT), ERDC/CRREL SR-16-2, Lever, J.H., G. Phillips, and J. Burnside (2016)
- High-Performance Plastic Sled Design for Polar Traversing, ERDC TR-15-2, Weale, J.C., J.H. Lever, and J. Trovillion (2015)
- Greenland Inland Traverse (GrIT): 2010 Mobility Performance and Implications, ERDC/CRREL TR-11-16, Lever, J.H. (2011)
- Mobility and Economic Feasibility of the Greenland Inland Traverse (GrIT), ERDC/CRREL TR-11-9, Lever, J.H., and J.C. Weale (2011)
- Feasibility of Overland Traverse to Re-Supply Summit Camp: Fleet Configuration and Economic Analysis, ERDC/CRREL TR-11-7, Lever, J.H., and J.C. Weale (2011)